References: Building-integrated

Public initiative in Kuala Lumpur (Malaysia)

 

Data

Location:

Kuala Lumpur (Malaysia)

Year built:

2007

Performance:

6 kWp

CO2 savings:

6.4 tons per year

Module:

112 thin film solarmodules

Inverter:

Fronius IG 60

Description

Malaysia is increasingly investing in regenerative energy so that they can be less dependent on natural gas and petroleum.

 

We integrated this installation into one of the five roofs of public electricity provider Pusat Tenaga’s buildings. At night the installation is sprinkled with water to clean it and maintain maximum solar module performance.

 

After a few months, it became clear that our installation delivered the best returns of all of the roof installations.